Independent sourcing partner for alternative building quotations. Not chief buildings and not affiliated with that brand.

How ArcField Sourcing holds a building quotation

This independent sourcing desk helps a business buyer write one brief and collect alternative factory quotations. It is not chief buildings, it does not claim authorized dealer status, and it does not publish a plant history because none is claimed here.

Review RFQ Checklist
  1. Use
  2. Dimensions
  3. Loads
  4. Jurisdiction
  5. Quantity
  6. Destination
Checklist beside a scale model of a steel bay

The path from search to comparable offers

01

Capture the reference

A brand search is recorded as the product family the buyer was exploring. It is not converted into an identity for this site and it is not treated as an order for that brand.

02

Lock the brief

Use, module dimensions, primary frame, secondary framing, purlins, girts, eave height, bay spacing, clear span, wind speed, ground snow load, seismic design category, foundation interface and destination are written before outreach. A worked check uses 20 ft eave height, 25 ft bay spacing, 60 ft clear span, 115 mph wind speed and 30 psf ground snow load, and leaves any unknown cell blank instead of copying another county.

03

Ask factories the same questions

Suppliers receive the same scope label and the same exclusion list. Responses that change span, coating or responsibility are returned as deviations.

04

Hand the matrix back

The buyer and the project professionals keep the technical and contracting decision. This desk coordinates questions. It does not stamp drawings or accept the building.

Boundaries that stay visible

No plant claim

Capacity and inventory are supplier facts. This page does not assign a primary frame, a weld shift or a stock list to ArcField Sourcing.

No borrowed projects

Case counts from another company stay there. A clear span or eave height in a brief is the buyer figure, not a borrowed project result.

No code promise

IBC, IRC, ASCE 7 and AISC 360 are checked against the site, the wind speed and the quoted system.

No mixed totals

Shell, delivered, installed and turnkey quotes keep separate columns, including the foundation interface.

No hidden budget rule

A target budget is optional. It does not rank a factory and it does not require a prior quote.

No public office pin

Street address and phone are not published. The form is the intake.

Bring the open items

If span, snow load or installation responsibility is still undecided, say that in the note. A partial brief is more useful than a brand name alone.

Request Factory Quotes